How We Build a Pickleball Court: 8-Step Process
A court build involves more than concrete and painted lines. Here is how Ace Courts coordinates the site, foundation, surface and equipment. The written proposal defines your project scope, and our in-house crews complete the work with no subcontractors.
1. Review the site and your goals
We discuss the sports you play, available dimensions, equipment access, grades, drainage and nearby improvements. Photos help start the conversation; the site assessment informs the construction plan.
2. Confirm the scope and schedule
The proposal identifies the planned layout, materials, work included and pricing. We discuss necessary approvals, decisions to make before construction and a schedule that accounts for the project and suitable working conditions.
3. Excavate and prepare the base
Our crews prepare the court area and establish elevations and drainage according to the project plan. The base supports the slab, so these decisions need to be settled before concrete work begins.
4. Construct the concrete slab
We coordinate forms, reinforcement and planned equipment locations before placing and finishing concrete. Where the design calls for post-tension construction, trained installers stress the tendons after the concrete develops the specified strength. Learn about post-tension court slabs.
5. Prepare the surface
The slab must meet the selected coating system’s readiness requirements before surfacing. We inspect and prepare it using methods compatible with that system. Existing courts have different preparation and repair needs; see our resurfacing service.
6. Apply the acrylic system
Our surfacing crews install the specified acrylic layers and selected colors. Preparation, application conditions and drying requirements all affect this stage. Cushioning can be included when it is part of the agreed system.
7. Add game lines and equipment
We lay out and paint the selected game lines, then complete the equipment included in your scope. Nets, hoops, fencing and lighting are coordinated throughout the build, with locations and any foundations planned before the pour.
8. Walk through the finished court
We review the completed work, explain the installed system’s return-to-play and care requirements, and answer your questions. Confirm when the surface is ready for use before bringing play onto it.
How long does construction take?
A typical full build takes roughly four to six weeks from excavation to walkthrough. Site conditions, concrete readiness, coating weather and equipment can affect that timing. Planning, approvals and the wait for a start date are additional considerations; we discuss the schedule for your project.
Plan your next court
Explore our complete court construction service or request a project quote. Send your location, intended sports, approximate dimensions and photos of the space.
Make this plan your own.
Discuss the site, scope, and materials with our team before starting your project.
Explore court servicesYOUR NEXT GREAT GAME STARTS HERE
Let’s put your plans
on the court.
Tell us where you’re building and what you want to play.
We’ll help you work out the next step.